IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
230057
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

I.2.10 Casual/Day Labor Children (i210_children)

Data file: lwh_baseline1b

Overview

Valid: 1959
Invalid: 3
Type: Discrete
Decimal: 0
Start: 18520
End: 18527
Width: 8
Range: -8888888 - 240000
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-8888888 Doesn't Know 0
0%
0 1931
98.6%
5000 1
0.1%
6000 1
0.1%
7000 1
0.1%
15000 1
0.1%
18000 1
0.1%
20000 3
0.2%
24000 1
0.1%
25000 1
0.1%
30000 2
0.1%
40000 2
0.1%
49000 1
0.1%
50000 1
0.1%
60000 2
0.1%
62000 1
0.1%
70000 1
0.1%
72000 2
0.1%
78000 1
0.1%
100000 1
0.1%
120000 1
0.1%
140000 1
0.1%
200000 1
0.1%
240000 1
0.1%
Sysmiss 3
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.