IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
227261
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

B.1.16 - How many of the last 12 months was he/she unable to perform normal acti (b116_02)

Data file: lwh_baseline1b

Overview

Valid: 556
Invalid: 1406
Type: Discrete
Decimal: 0
Start: 2152
End: 2153
Width: 2
Range: 1 - 12
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 258
46.4%
1.5 1
0.2%
2 99
17.8%
3 58
10.4%
4 29
5.2%
5 18
3.2%
6 23
4.1%
7 6
1.1%
8 8
1.4%
9 2
0.4%
10 6
1.1%
11 4
0.7%
12 44
7.9%
Sysmiss 1406
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.