IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
229849
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

J.4.14. What was the collateral required to secure the loan? (j414_3)

Data file: lwh_baseline1b

Overview

Valid: 3
Invalid: 1959
Type: Discrete
Decimal: 0
Start: 21069
End: 21069
Width: 1
Range: 1 - 8
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 Land 2
66.7%
2 Livestock 0
0%
3 House 1
33.3%
4 Warehouse receipts 0
0%
5 Machines & equipment 0
0%
6 HH/ individual savings 0
0%
7 Group Savings 0
0%
8 Other (specify) 0
0%
Sysmiss 1959
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.