IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
228585
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

J.4.15 What is the purpose for which the loan was taken? OTHER SPECIFY (j415_specify_1)

Data file: lwh_baseline1b

Overview

Valid: 42
Invalid: 0
Type: Discrete
Start: 21259
End: 21318
Width: 60
Range: -
Format: character

Questions and instructions

Categories
Value Category Cases
-7 18
42.9%
1000000 1
2.4%
AMASAKA YO GUCURUZA 1
2.4%
ELECTRICITY 1
2.4%
FOOD 1
2.4%
FOR ALL AGRICULTURAL ACTIVITIES 1
2.4%
GUCURUZA UMUTOBE 1
2.4%
GUHAHA 1
2.4%
GUHINGISHA 1
2.4%
GUKORESHA GARE 1
2.4%
KUGIRANGO BAHINGE 1
2.4%
KUGURA MOTO 1
2.4%
KUYIKENUZA 1
2.4%
KUZANA AMASHANYARAZI N'AMAZI 1
2.4%
KUZANA UMURIRO IWE 1
2.4%
KWAGURA UBUHINZI BW'IKAWA 1
2.4%
KWISHYURA IDENI 1
2.4%
KWISHYURA UMU AVOCAT 1
2.4%
SETTING WATER IN HOUSE 1
2.4%
UGHAHA GUSURA UMWANA UFUNZE 1
2.4%
UMURIRO 1
2.4%
UMUSARANI 1
2.4%
YAYAKORESHEJE MU RUGENDO 1
2.4%
kuyikenuza 1
2.4%
mu buhinzi 1
2.4%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.