IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
229693
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

J.4.18 What is the length of repayment of the loan (Days)? (j418_rate_2)

Data file: lwh_baseline1b

Overview

Valid: 10
Invalid: 1952
Minimum: 91.31
Maximum: 1461
Type: Continuous
Decimal: 0
Start: 21497
End: 21512
Width: 16
Range: 91.3104019165039 - 1461
Format: Numeric
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.