IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
249815
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

B.2.11 - What was [NAME]'s main occupation in the last week? (b211_01)

Data file: lwh_baseline1b

Overview

Valid: 1786
Invalid: 176
Type: Discrete
Decimal: 0
Start: 4022
End: 4022
Width: 1
Range: 0 - 9
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 No work during last month 0
0%
1 own farm 1499
83.9%
2 land husbandry for LWH 0
0%
3 other farm work (non-HH) 78
4.4%
4 domestic work (non-HH) 3
0.2%
5 petty / retail trade 34
1.9%
6 construction 59
3.3%
7 transportation 7
0.4%
8 carpentry 10
0.6%
9 other 96
5.4%
Sysmiss 176
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.