IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F1]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
294077
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

B.2.16 - How much was [NAME]'s last cash payment? (b216_02)

Data file: lwh_baseline1b

Overview

Valid: 236
Invalid: 1726
Type: Discrete
Decimal: 0
Start: 4484
End: 4489
Width: 6
Range: -88 - 100000
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-88 Doesn't Know 0
0%
5 1
0.4%
100 1
0.4%
120 1
0.4%
500 9
3.8%
600 18
7.6%
700 45
19.1%
800 18
7.6%
1000 13
5.5%
1200 1
0.4%
1500 6
2.5%
1800 1
0.4%
2000 16
6.8%
2100 3
1.3%
2500 1
0.4%
3000 9
3.8%
3500 2
0.8%
3600 1
0.4%
3700 1
0.4%
4000 5
2.1%
4200 1
0.4%
4900 1
0.4%
5000 11
4.7%
6000 5
2.1%
7000 2
0.8%
7500 2
0.8%
8000 2
0.8%
8750 1
0.4%
9000 1
0.4%
9500 1
0.4%
10000 7
3%
12000 3
1.3%
15000 2
0.8%
17400 1
0.4%
20000 10
4.2%
23000 1
0.4%
24000 2
0.8%
25000 1
0.4%
30000 6
2.5%
32000 1
0.4%
35000 3
1.3%
36000 2
0.8%
40000 2
0.8%
44000 1
0.4%
48000 1
0.4%
50000 4
1.7%
60000 3
1.3%
63000 1
0.4%
75000 1
0.4%
80000 1
0.4%
90000 1
0.4%
92000 1
0.4%
92800 1
0.4%
100000 1
0.4%
Sysmiss 1726
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.