IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F2]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
227527
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

What MONTH and YEAR was this plot terraced? MONTH: [PLOT 2] (pl_t2m_a_p_p2)

Data file: lwh_baseline1c

Overview

Valid: 184
Invalid: 316
Type: Discrete
Decimal: 0
Start: 2935
End: 2937
Width: 3
Range: -88 - 12
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-88 don't know 108
58.7%
-66 refuse to answer 14
7.6%
1 January 1
0.5%
2 February 2
1.1%
3 March 1
0.5%
4 April 13
7.1%
5 May 7
3.8%
6 June 4
2.2%
7 July 3
1.6%
8 August 5
2.7%
9 September 10
5.4%
10 October 3
1.6%
11 November 2
1.1%
12 December 11
6%
Sysmiss 316
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
"What MONTH and YEAR was this plot terraced? MONTH:"
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.