IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F2]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
227700
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

[]: Who was primarily responsible for making decisions about this [P [PLOT 2] (ag10_13b_p2)

Data file: lwh_baseline1c

Overview

Valid: 330
Invalid: 170
Type: Discrete
Decimal: 0
Start: 3147
End: 3148
Width: 2
Range: 1 - 12
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 HH Roster Member 1 197
59.7%
2 HH Roster Member 2 133
40.3%
3 HH Roster Member 3 0
0%
4 HH Roster Member 4 0
0%
5 HH Roster Member 5 0
0%
6 HH Roster Member 6 0
0%
7 HH Roster Member 7 0
0%
8 HH Roster Member 8 0
0%
9 HH Roster Member 9 0
0%
10 HH Roster Member 10 0
0%
11 HH Roster Member 11 0
0%
12 HH Roster Member 12 0
0%
Sysmiss 170
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
"[]: Who was primarily responsible for making decisions about this [PLOT] during Season B 2013?"
"[]:What is the gender of the person who was primarily responsible for making decisions about this [PLOT] during Season B 2013?"
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.