IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F2]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
233598
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

[]: What was the total storage cost incurred to store the [${crop_1 [CROP 1] [PL (crp_30_13a_c1_p3)

Data file: lwh_baseline1c

Overview

Valid: 53
Invalid: 447
Minimum: 0
Maximum: 1500
Type: Continuous
Decimal: 0
Start: 11180
End: 11183
Width: 4
Range: 0 - 1500
Format: Numeric

Others

Notes
"[]: What was the total storage cost incurred to store the [] at the post-harvest infra-structure?"
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.