IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F3]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
280552
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

PESTICIDES: how much in total did HH spend? (plot 1) (ag_12_g_1)

Data file: lwh_followup1

Overview

Valid: 122
Invalid: 3106
Type: Discrete
Decimal: 0
Start: 8261
End: 8266
Width: 6
Range: 0 - 85000
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 43
35.2%
1 1 0
0%
2 2 0
0%
3 3 0
0%
4 4 0
0%
5 5 0
0%
6 6 0
0%
7 7 0
0%
8 8 0
0%
9 9 0
0%
10 10 0
0%
11 11 0
0%
250 1
0.8%
400 1
0.8%
500 1
0.8%
600 1
0.8%
700 1
0.8%
750 1
0.8%
800 1
0.8%
1000 21
17.2%
1200 2
1.6%
1250 1
0.8%
1500 3
2.5%
1700 2
1.6%
1750 2
1.6%
2000 4
3.3%
2600 1
0.8%
3000 3
2.5%
3500 2
1.6%
4000 4
3.3%
4500 2
1.6%
4800 1
0.8%
4900 2
1.6%
5000 10
8.2%
6000 4
3.3%
8000 3
2.5%
15000 1
0.8%
20000 1
0.8%
22000 1
0.8%
66000 1
0.8%
85000 1
0.8%
100001 .B 3106
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.