IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F3]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
280436
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

ORGANIC MANURE: how much in total did HH spend? (plot 2) (ag_12_b_2)

Data file: lwh_followup1

Overview

Valid: 35
Invalid: 3193
Type: Discrete
Decimal: 0
Start: 8576
End: 8582
Width: 7
Range: 0 - 180000
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 3
8.6%
1 1 0
0%
2 2 0
0%
3 3 0
0%
4 4 0
0%
5 5 0
0%
6 6 0
0%
7 7 0
0%
8 8 0
0%
9 9 0
0%
10 10 0
0%
11 11 0
0%
5000 1
2.9%
6500 1
2.9%
7500 1
2.9%
8000 1
2.9%
10000 3
8.6%
10800 1
2.9%
11050 1
2.9%
11500 1
2.9%
11800 1
2.9%
12500 1
2.9%
14000 1
2.9%
14800 1
2.9%
15000 2
5.7%
16000 1
2.9%
17000 1
2.9%
19000 1
2.9%
21000 1
2.9%
22000 1
2.9%
25000 3
8.6%
30000 2
5.7%
35000 1
2.9%
40000 1
2.9%
43000 1
2.9%
50000 1
2.9%
90000 1
2.9%
180000 1
2.9%
1000001 .B 3193
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.