IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F3]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
239650
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

NPK: how much in total did HH spend? (plot 2) (ag_12_c_2)

Data file: lwh_followup1

Overview

Valid: 44
Invalid: 3184
Type: Discrete
Decimal: 0
Start: 8727
End: 8732
Width: 6
Range: 0 - 55000
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 3
6.8%
1 1 0
0%
2 2 0
0%
3 3 0
0%
4 4 0
0%
5 5 0
0%
6 6 0
0%
7 7 0
0%
8 8 0
0%
9 9 0
0%
10 10 0
0%
11 11 0
0%
2200 1
2.3%
2400 1
2.3%
2500 3
6.8%
3000 1
2.3%
3500 1
2.3%
4400 1
2.3%
4840 1
2.3%
5000 1
2.3%
5325 1
2.3%
5375 1
2.3%
5500 1
2.3%
6000 4
9.1%
8500 1
2.3%
9000 1
2.3%
9240 1
2.3%
10000 2
4.5%
13200 2
4.5%
13800 1
2.3%
14000 2
4.5%
15000 3
6.8%
16380 1
2.3%
17500 1
2.3%
18040 1
2.3%
19660 1
2.3%
21000 3
6.8%
21600 1
2.3%
25000 1
2.3%
40000 1
2.3%
55000 1
2.3%
100001 .B 3184
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.