IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F3]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
234381
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

What is the main construction material of the walls of your house? (hh_02)

Data file: lwh_followup1

Overview

Valid: 3227
Invalid: 1
Type: Discrete
Decimal: 0
Start: 54306
End: 54315
Width: 10
Range: -88 - 2147483646
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-88 Don't know 0
0%
-77 Not applicable 0
0%
-66 Refused to answer 0
0%
1 adobe/unburnt bricks 2591
80.3%
2 fired bricks 96
3%
3 cemented mud and wattle 113
3.5%
4 uncemented mud and wattle 67
2.1%
5 wattle and reeds 332
10.3%
6 concrete/cement/cement blocks 21
0.7%
7 other 7
0.2%
2147483622 Don't Know 0
0%
2147483623 N/A 0
0%
2147483625 Refused to answer 0
0%
2147483645 Missing 0
0%
2147483646 Outrange 0
0%
11 .D 1
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.