IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F3]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
229271
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

COOPERATIVE: What would the consequence be if you failed to repay this loan? (crd_21_j)

Data file: lwh_followup1

Overview

Valid: 17
Invalid: 3211
Type: Discrete
Decimal: 0
Start: 62327
End: 62336
Width: 10
Range: -88 - 2147483646
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-88 Don't know 0
0%
-77 Not applicable 0
0%
-66 Refused to answer 0
0%
1 unable to take more loans from this source 5
29.4%
2 social problems/pressure 0
0%
3 family problems/pressure 5
29.4%
4 nothing would happen 1
5.9%
5 unable to take more loans from any source 6
35.3%
6 other 0
0%
2147483622 Don't Know 0
0%
2147483623 N/A 0
0%
2147483625 Refused to answer 0
0%
2147483645 Missing 0
0%
2147483646 Outrange 0
0%
11 .B 3211
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.