IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F4]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
226572
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

ROS_07: Highest level of education completed of member 2 (old member) (ros_07_2)

Data file: lwh_followup2

Overview

Valid: 2687
Invalid: 391
Type: Discrete
Decimal: 0
Start: 1120
End: 1129
Width: 10
Range: 1 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 None 718
26.7%
2 Some primary 1227
45.7%
3 Completed primary 555
20.7%
4 Some secondary 148
5.5%
5 Completed secondary 17
0.6%
6 Some university 7
0.3%
7 Completed university 3
0.1%
8 Vocational training 12
0.4%
99 Other 0
0%
2147483622 Don't know 0
0%
2147483623 N/A 0
0%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483646 Outrange 0
0%
2147483647 Has data while shouldn't 0
0%
11 .B 391
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.