IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F4]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
249971
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

INC_07: pension (RWF) (inc_07)

Data file: lwh_followup2

Overview

Valid: 3076
Invalid: 2
Type: Discrete
Decimal: 2
Start: 3295
End: 3307
Width: 13
Range: 0 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 3036
98.7%
99 Other 0
0%
500 1
0%
2000 2
0.1%
3000 2
0.1%
5000 3
0.1%
6000 2
0.1%
8000 2
0.1%
9000 1
0%
12000 2
0.1%
15000 2
0.1%
20000 2
0.1%
24000 1
0%
27000 1
0%
30000 5
0.2%
36000 1
0%
38000 1
0%
40000 2
0.1%
49000 1
0%
50000 2
0.1%
60000 1
0%
70100 1
0%
80000 1
0%
100000 1
0%
110760 1
0%
150000 1
0%
332000 1
0%
2147483622 Don't know 0
0%
2147483623 N/A 0
0%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483647 Has data while shouldn't 0
0%
1000001 Outrange 2
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
"INC_07: pension (RWF)"
"pension (RWF)"
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.