IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F4]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
251127
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

EXP_07: Electricity (RWF) (exp_07)

Data file: lwh_followup2

Overview

Valid: 3073
Invalid: 5
Type: Discrete
Decimal: 2
Start: 3477
End: 3489
Width: 13
Range: 0 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 2881
93.8%
99 Other 0
0%
100 4
0.1%
150 12
0.4%
155 1
0%
200 14
0.5%
250 7
0.2%
300 12
0.4%
350 2
0.1%
375 1
0%
400 6
0.2%
450 1
0%
500 43
1.4%
600 2
0.1%
700 3
0.1%
800 2
0.1%
1000 47
1.5%
1250 2
0.1%
1500 11
0.4%
1700 1
0%
2000 8
0.3%
3000 5
0.2%
3500 1
0%
4000 1
0%
5000 1
0%
5300 1
0%
35000 1
0%
50000 1
0%
56000 1
0%
600000 1
0%
2147483622 Don't know 0
0%
2147483623 N/A 0
0%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483647 Has data while shouldn't 0
0%
1000001 Outrange 5
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
"EXP_07: Electricity (RWF)"
"Electricity (RWF)"
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.