IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F4]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
249369
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

[Producing compost]: LAB_06: How much in total did they earn for ? (RWF) (lab_06_1)

Data file: lwh_followup2

Overview

Valid: 24
Invalid: 3054
Type: Discrete
Decimal: 2
Start: 6825
End: 6837
Width: 13
Range: 0 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 16
66.7%
99 Other 0
0%
400 1
4.2%
500 1
4.2%
1000 1
4.2%
2000 1
4.2%
20000 1
4.2%
37000 1
4.2%
50000 1
4.2%
100000 1
4.2%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483646 Outrange 0
0%
2147483647 Has data while shouldn't 0
0%
1000001 N/A 3054
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
"LAB_06: How much in total did they earn for ? (RWF)"
"How much in total did they earn for [] during Season B 2013? (RWF)"
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.