IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F4]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
249275
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

[Safekeeping Family/Friend]: RF_10: Since March 1, 2013, how much have you depos (rf_10_8)

Data file: lwh_followup2

Overview

Valid: 16
Invalid: 3062
Type: Discrete
Decimal: 2
Start: 8302
End: 8314
Width: 13
Range: 0 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 1
6.3%
99 Other 0
0%
3000 1
6.3%
5000 1
6.3%
10000 1
6.3%
30000 2
12.5%
50000 2
12.5%
70000 1
6.3%
100000 3
18.8%
120000 1
6.3%
190000 1
6.3%
300000 1
6.3%
700000 1
6.3%
2147483622 Don't know 0
0%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483646 Outrange 0
0%
2147483647 Has data while shouldn't 0
0%
1000001 N/A 3062
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
"RF_10: Since March 1, 2013, how much have you deposited into ?"
"from March to December 2013, how much have you deposited into []?"
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.