IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F4]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
250109
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

[SACCO]: What is the length of the repayment period? (In months) (crd_14_2)

Data file: lwh_followup2

Overview

Valid: 99
Invalid: 2979
Type: Discrete
Decimal: 2
Start: 11499
End: 11511
Width: 13
Range: 0 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 1
1%
0.0833333358168602 20
20.2%
0.16666667163372 1
1%
0.666666686534882 3
3%
1 14
14.1%
1.25 1
1%
1.33333337306976 11
11.1%
1.66666662693024 5
5.1%
2 13
13.1%
2.33333325386047 6
6.1%
3 1
1%
3.33333325386047 1
1%
4 6
6.1%
6 1
1%
8 1
1%
10 1
1%
16 1
1%
20 1
1%
29.6666660308838 1
1%
30 4
4%
60 1
1%
99 Other 0
0%
150 1
1%
180 1
1%
2700 3
3%
2147483622 Don't know 0
0%
2147483623 N/A 0
0%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483646 Outrange 0
0%
2147483647 Has data while shouldn't 0
0%
10001 .. 0
Sysmiss 2979
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.