IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F4]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
252351
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

[RELATIVE]: What is the length of the repayment period? (In months) (crd_14_5)

Data file: lwh_followup2

Overview

Valid: 210
Invalid: 2868
Type: Discrete
Decimal: 2
Start: 11538
End: 11550
Width: 13
Range: 0 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
0 19
9%
0.0833333358168602 8
3.8%
0.16666667163372 1
0.5%
0.333333343267441 58
27.6%
0.666666686534882 37
17.6%
1 16
7.6%
1.33333337306976 7
3.3%
1.66666662693024 2
1%
2 5
2.4%
2.66666674613953 2
1%
3.33333325386047 2
1%
4 16
7.6%
8 8
3.8%
12 3
1.4%
30 6
2.9%
60 1
0.5%
90 5
2.4%
99 Other 0
0%
150 1
0.5%
210 2
1%
300 1
0.5%
450 3
1.4%
900 4
1.9%
1350 1
0.5%
1800 1
0.5%
3600 1
0.5%
2147483622 Don't know 0
0%
2147483623 N/A 0
0%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483646 Outrange 0
0%
2147483647 Has data while shouldn't 0
0%
10001 .. 0
Sysmiss 2868
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.