IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2012-2016_LWHIE-BL-F2_V01_M / variable [F4]
central

Land Husbandry, Water Harvesting and Hillside Irrigation Project Impact Evaluation 2012-2016, Baseline, First Follow-up and Second Follow-up Surveys

Rwanda, 2012 - 2016
Get Microdata
Reference ID
RWA_2012-2016_LWHIE-BL-F2_v01_M
Producer(s)
Florence Kondylis, Maria Jones, Saahil Karpe
Metadata
DDI/XML JSON
Created on
Dec 05, 2022
Last modified
Dec 05, 2022
Page views
250439
  • Study Description
  • Data Dictionary
  • Get Microdata
  • Data files
  • lwh_baseline1b
  • lwh_baseline1c
  • lwh_followup1
  • lwh_followup2

Why was less applied than planned? [NPK] (ag_15_a_i3)

Data file: lwh_followup2

Overview

Valid: 101
Invalid: 2977
Type: Discrete
Decimal: 0
Start: 24677
End: 24686
Width: 10
Range: 1 - 2147483647
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 insufficient savings 58
57.4%
2 could not secure a loan 16
15.8%
3 interest rates for credit higher than planned 1
1%
4 prioritized other expenditures 3
3%
99 Other 23
22.8%
2147483622 Don't know 0
0%
2147483623 N/A 0
0%
2147483625 Refuse to answer 0
0%
2147483645 Missing 0
0%
2147483646 Outrange 0
0%
2147483647 Has data while shouldn't 0
0%
101 .B 2977
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.

Others

Notes
"Why was less applied than planned?"
"AG_15_A: Why was less applied than planned?"
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.