IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2022_MTF_V01_M / variable [F11]
central

Multi-Tier Framework Energy Survey, 2022

Rwanda, 2022
Get Microdata
Reference ID
RWA_2022_MTF_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Feb 19, 2025
Last modified
Feb 19, 2025
Page views
33295
Downloads
201
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Community_SectB
  • Community_SectE
  • Community_SectF
  • Community_Section_CDGHI
  • Education
    facility_DATASET_BC
  • Education
    facility_DATASET_C2
  • Health
    facility_Dataset
  • ROSTER_A1
  • SECTION_A2
  • SECTION_B
  • SECTION_C1
  • SECTION_C2
  • SECTION_D
  • SECTION_DE
  • SECTION_EF1
  • SECTION_F1
  • SECTION_F2
  • SECTION_G1
  • SECTION_G2
  • SECTION_H
  • SECTION_I
  • SECTION_I2J
  • Section_KL
  • SECTION_MN

Second most serious problems experienced with grid electricity (C037_SECOND)

Data file: SECTION_C1

Overview

Valid: 2649
Invalid: 3057
Minimum: 1
Maximum: 555
Type: Discrete
Decimal: 0
Width: 12
Range: 1 - 555
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 Supply shortage/not enough hours of electricity 49
1.8%
2 Low/high voltage problems or voltage fluctuations 98
3.7%
3 Unpredictable interruptions 180
6.8%
4 Unexpectedly high bills 18
0.7%
5 High cost of electricity 98
3.7%
6 Do not trust the supplier 1
0%
7 Cannot power large appliances 19
0.7%
8 Maintenance/service problems 22
0.8%
9 Unpredictable bills 4
0.2%
111 No problems 2140
80.8%
555 Other, specify 20
0.8%
Sysmiss 3057
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.