IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2022_MTF_V01_M / variable [F9]
central

Multi-Tier Framework Energy Survey, 2022

Rwanda, 2022
Get Microdata
Reference ID
RWA_2022_MTF_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Feb 19, 2025
Last modified
Feb 19, 2025
Page views
33116
Downloads
201
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Community_SectB
  • Community_SectE
  • Community_SectF
  • Community_Section_CDGHI
  • Education
    facility_DATASET_BC
  • Education
    facility_DATASET_C2
  • Health
    facility_Dataset
  • ROSTER_A1
  • SECTION_A2
  • SECTION_B
  • SECTION_C1
  • SECTION_C2
  • SECTION_D
  • SECTION_DE
  • SECTION_EF1
  • SECTION_F1
  • SECTION_F2
  • SECTION_G1
  • SECTION_G2
  • SECTION_H
  • SECTION_I
  • SECTION_I2J
  • Section_KL
  • SECTION_MN

Third main ways your business is affected by an electricity outage (A58C)

Data file: SECTION_A2

Overview

Valid: 46
Invalid: 5660
Minimum: 1
Maximum: 9
Type: Discrete
Decimal: 0
Width: 6
Range: 1 - 9
Format: Numeric

Questions and instructions

Categories
Value Category Cases
1 Had to turn customers away 2
4.3%
2 Had to send workers home for the day without pay 0
0%
3 Had to send workers home for the day with pay 1
2.2%
4 Used more expensive alternate energy sources to run operations/ keep perishables cold 0
0%
5 Wasted perishable products/discarded damaged goods 1
2.2%
6 Machines/appliances were damaged in the process 2
4.3%
7 Meetings/transactions were delayed 0
0%
8 Stopped operations and waited for power to return 1
2.2%
9 Not affected by typical outages 39
84.8%
555 Other, specify 0
0%
Sysmiss 5660
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.