IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KOR_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Korea, Rep., 2024 - 2025
Get Microdata
Reference ID
KOR_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 20, 2025
Last modified
May 20, 2025
Page views
1059
Downloads
12
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Korea-Republic-2024-full-data.dta

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Korea-Republic-2024-full-data.dta

Overview

Valid: 100
Invalid: 1418
Minimum: -9
Maximum: 30
Type: Discrete
Decimal: 0
Start: 166
End: 167
Width: 2
Range: -9 - 30
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 3
3%
-6 Still in process 1
1%
-5 Application denied 0
0%
1 One day or less 36
36%
2 4
4%
3 12
12%
4 4
4%
5 8
8%
7 19
19%
10 1
1%
14 4
4%
15 1
1%
20 1
1%
30 6
6%
Sysmiss 1418
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.