IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KOR_2024_WBES_V01_M / variable [F1]
central

World Bank Enterprise Survey 2024

Korea, Rep., 2024 - 2025
Get Microdata
Reference ID
KOR_2024_WBES_v01_M
Producer(s)
World Bank Group (WBG)
Metadata
Documentation in PDF DDI/XML JSON
Study website
Created on
May 20, 2025
Last modified
May 20, 2025
Page views
1085
Downloads
12
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Korea-Republic-2024-full-data.dta

How Many Days Did It Take For You To Obtain A Water Connection? (c13)

Data file: Korea-Republic-2024-full-data.dta

Overview

Valid: 33
Invalid: 1485
Minimum: 1
Maximum: 30
Type: Discrete
Decimal: 0
Start: 211
End: 212
Width: 2
Range: 1 - 30
Format: Numeric

Questions and instructions

Categories
Value Category Cases
-9 Don't know (spontaneous) 0
0%
-6 Still in process 0
0%
-5 Application denied 0
0%
1 One day or less 13
39.4%
2 2
6.1%
3 2
6.1%
4 3
9.1%
5 3
9.1%
7 7
21.2%
10 1
3%
20 1
3%
30 1
3%
Sysmiss 1485
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.