IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / BLR_2009_MOI_V01_M_WB / variable [F1]
central

Management, Organization and Innovation Survey 2009

Belarus, 2008 - 2009
Get Microdata
Reference ID
BLR_2009_MOI_v01_M_WB
Producer(s)
World Bank, European Bank for Reconstruction and Development
Metadata
DDI/XML JSON
Created on
Dec 19, 2011
Last modified
Mar 29, 2019
Page views
13642
Downloads
1629
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Related Publications
  • Data files
  • Belarus-2009-MOI-full
    data-

other (specify) (moia15b6ax)

Data file: Belarus-2009-MOI-full data-

Overview

Valid: 17
Invalid: 0
Type: Discrete
Start: 951
End: 1018
Width: 68
Format:

Questions and instructions

Categories
Value Category
Chief engineer
Chief engineer of production
Deputy of general director of production
Engineering service
HR
Techical production
power engineering
production
reponsible for the implementation of technical projects
technical services
technical services and initial stage production
technical services and technical support of the factory
technical support of production
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.