IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / KEN_2013_MS_V01_M / variable [F1]
central

Micro-Enterprise Survey 2013

Kenya, 2013 - 2014
Get Microdata
Reference ID
KEN_2013_MS_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Apr 07, 2014
Last modified
Mar 29, 2019
Page views
20151
Downloads
1267
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Kenya_Micro-2013-full
    data

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Kenya_Micro-2013-full data

Overview

Valid: 21
Invalid: 339
Type: Discrete
Decimal: 0
Start: 133
End: 135
Width: 3
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category
-9 DK
-6 Still in process
-5 Application denied
1 Less than one day
2
7
21
30
60
90
180
700
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.