IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / ZWE_2016_MS_V01_M / variable [F2]
central

Micro-Enterprise Survey 2016

Zimbabwe, 2016 - 2017
Get Microdata
Reference ID
ZWE_2016_MS_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Study website
Created on
Jun 26, 2017
Last modified
Jun 26, 2017
Page views
13426
Downloads
693
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • zimbabwemicro_2016_full_data

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: zimbabwemicro_2016_full_data

Overview

Valid: 4
Invalid: 356
Type: Discrete
Decimal: 0
Start: 1025
End: 1026
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 Don't know (spontaneous)
-6 Still in process
-5 Application denied
1 One day or less
4
6
30
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory

Others

Notes
G.3 In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.