IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NAM_2012_AFB-R5_V01_M / variable [F1]
central

Afrobarometer Survey 2012, Round 5

Namibia, 2012
Get Microdata
Reference ID
NAM_2012_AFB-R5_v01_M
Producer(s)
The Institute for Democracy in South Africa (IDASA), Ghana Centre for Democratic Development (CDD-Ghana), Michigan State University (MSU)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
7352
Downloads
193
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • nam_r5_data_july_2015

Q72b2_NAM: Who responsible: Regional Governors do jobs (Q72B2_NAM)

Data file: nam_r5_data_july_2015

Overview

Valid: 1200
Invalid: 0
Type: Discrete
Decimal: 0
Start: 1056
End: 1058
Width: 3
Range: -1 - 998
Format: Numeric

Questions and instructions

Literal question
72. Who should be responsible for:
B2_NAM. Making sure, that once elected, Regional Governors do their jobs?
Categories
Value Category Cases
-1 Missing 2
0.2%
0 The president/executive 535
44.6%
1 The parliament/local council 271
22.6%
2 Their political party 155
12.9%
3 The voters 202
16.8%
4 No one 3
0.3%
9 Don't know 32
2.7%
998 Refused 0
0%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.