IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / MLI_2012_AFB-R5_V01_M / variable [F2]
central

Afrobarometer Survey 2012, Round 5

Mali, 2012
Get Microdata
Reference ID
MLI_2012_AFB-R5_v01_M
Producer(s)
The Institute for Democracy in South Africa (IDASA), Ghana Centre for Democratic Development (CDD-Ghana), Michigan State University (MSU)
Metadata
DDI/XML JSON
Created on
Jan 16, 2021
Last modified
Jan 16, 2021
Page views
8004
Downloads
170
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • mli_r5_data_july_2015.sav

Q72a. Who responsible: MPs do jobs (Q72A)

Data file: mli_r5_data_july_2015.sav

Overview

Valid: 1200
Invalid: -
Minimum: 0
Maximum: 9
Type: Discrete
Decimal: 0
Start: 727
End: 729
Width: 3
Range: 0 - 9
Format: Numeric

Questions and instructions

Literal question
72. Qui devrait être responsable de:
A. S’assurer qu’une fois élus, les députés de l’Assemblée Nationale font leur travail ?
Categories
Value Category Cases
-1 Missing 0
0%
0 The president/executive 397
33.1%
1 The parliament/local council 184
15.3%
2 Their political party 160
13.3%
3 The voters 369
30.8%
4 No one 29
2.4%
9 Don't know 61
5.1%
998 Refused 0
0%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.