IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / RWA_2011_MS_V01_M / variable [F1]
central

Micro-Enterprise Survey 2011

Rwanda, 2011 - 2012
Get Microdata
Reference ID
RWA_2011_MS_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Dec 12, 2013
Last modified
Mar 29, 2019
Page views
19640
Downloads
1204
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Rwandamicro-2011
    data-

How Many Days Did It Take For You To Obtain A Construction-Related Permit? (g3)

Data file: Rwandamicro-2011 data-

Overview

Valid: 6
Invalid: 142
Type: Discrete
Decimal: 0
Start: 361
End: 362
Width: 2
Range: -
Format:

Questions and instructions

Literal question
In reference to that application for a construction-related permit, approximately how many days did it take to obtain it from the day of the application to the day the permit was granted?
Categories
Value Category
-9 do not know (spontaneous)
-6 still in process
-5 application denied
1 less than one day
7
45
66
Sysmiss
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Waiting time for construction permit. Self-explanatory
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.