IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Nepal, 2013
Get Microdata
Reference ID
NPL_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
12852
Downloads
443
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal-2013-full
    data-
  • Nepal-female-managed-2013

How many days, on average, does it take to manufacture the goods? (SARd19b)

Data file: Nepal-2013-full data-

Overview

Valid: 241
Invalid: 241
Type: Discrete
Decimal: 0
Start: 411
End: 413
Width: 3
Range: -9 - 150
Format: Numeric

Questions and instructions

Literal question
For your main product or batch of goods that this establishment manufactures:
How many days, on average, does it take to manufacture the goods?
Categories
Value Category Cases
-9 Don't know 1
0.4%
1 41
17%
2 36
14.9%
3 24
10%
4 14
5.8%
5 13
5.4%
6 5
2.1%
7 32
13.3%
8 1
0.4%
9 1
0.4%
10 20
8.3%
12 3
1.2%
13 1
0.4%
15 18
7.5%
18 1
0.4%
20 2
0.8%
21 1
0.4%
22 1
0.4%
24 1
0.4%
25 5
2.1%
30 10
4.1%
45 3
1.2%
50 1
0.4%
60 4
1.7%
90 1
0.4%
150 1
0.4%
Sysmiss 241
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
INTERVIEWER READ OUT
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.