    Home / Central Data Catalog / NPL_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Nepal, 2013
Get Microdata
Reference ID
NPL_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
12908
Downloads
443
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal-2013-full
    data-
  • Nepal-female-managed-2013

How Many Days Did It Take For You To Receive An Electrical Connection Service? (c4)

Data file: Nepal-2013-full data-

Overview

Valid: 42
Invalid: 440
Type: Discrete
Decimal: 0
Start: 103
End: 105
Width: 3
Range: -9 - 180
Format: Numeric

Questions and instructions

Literal question
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of the application to the day the service was received?
Categories
Value Category Cases
-9 Don't know 1
2.4%
-6 Still in process 5
11.9%
-5 Application denied 0
0%
1 Less than one day 10
23.8%
2 1
2.4%
3 2
4.8%
6 1
2.4%
7 1
2.4%
10 2
4.8%
12 2
4.8%
15 8
19%
21 1
2.4%
30 5
11.9%
60 1
2.4%
90 1
2.4%
180 1
2.4%
Sysmiss 440
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Wait for electrical connection. Self-explanatory

Others

Notes
In reference to that application for an electrical connection, approximately how many days did it take to obtain it from the day of application to the day the service was received?
Back to Catalog