IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Nepal, 2013
Get Microdata
Reference ID
NPL_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
12815
Downloads
442
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal-2013-full
    data-
  • Nepal-female-managed-2013

When You Applied For A Water Connection, Was An Informal Gift/payment Requested? (c14)

Data file: Nepal-2013-full data-

Overview

Valid: 2
Invalid: 480
Type: Discrete
Decimal: 0
Start: 132
End: 133
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
In reference to that application for a water connection, was an informal gift or payment expected or requested?
Categories
Value Category Cases
-9 Don't know 0
0%
-8 Refuse 0
0%
1 Yes 1
50%
2 No 1
50%
Sysmiss 480
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1) Bribe for water connection. Self-explanatory
2) Sensitive question, no clarification can be offered.

Others

Notes
In reference to that application for a water connection, was an informal gift or payment expected or requested?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.