IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Nepal, 2013
Get Microdata
Reference ID
NPL_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
12781
Downloads
442
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal-2013-full
    data-
  • Nepal-female-managed-2013

Did You Experience Insufficient Water Supply For Production In Last Fiscal Yr? (c15)

Data file: Nepal-2013-full data-

Overview

Valid: 241
Invalid: 241
Type: Discrete
Decimal: 0
Start: 134
End: 135
Width: 2
Range: -9 - 2
Format: Numeric

Questions and instructions

Literal question
Over fiscal year 2011/2012, did this establishment experience insufficient water supply for production?
Categories
Value Category Cases
-9 Don't know 0
0%
-7 The establishment does not use water for production 51
21.2%
1 Yes 17
7.1%
2 No 173
71.8%
Sysmiss 241
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
Insufficient water supply: whenever there is equipment failure or cessation of production operations due to the lack of or reduction in water supply.
Question post text
If answer is No or Don't Know then GO TO QUESTION C.19

Others

Notes
Over fiscal year 2011/2012, did this establishment experience insufficient water supply for production?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.