IHSN Survey Catalog
  • Home
  • Microdata Catalog
  • Citations
  • Login
    Login
    Home / Central Data Catalog / NPL_2013_ES_V01_M / variable [F1]
central

Enterprise Survey 2013

Nepal, 2013
Get Microdata
Reference ID
NPL_2013_ES_v01_M
Producer(s)
World Bank
Metadata
DDI/XML JSON
Created on
Dec 05, 2019
Last modified
Dec 05, 2019
Page views
12723
Downloads
442
  • Study Description
  • Data Dictionary
  • Downloads
  • Get Microdata
  • Data files
  • Nepal-2013-full
    data-
  • Nepal-female-managed-2013

How Much Of An Obstacle: Electricity To Operations Of This Establishment? (c30a)

Data file: Nepal-2013-full data-

Overview

Valid: 482
Invalid: 0
Type: Discrete
Decimal: 0
Start: 146
End: 147
Width: 2
Range: -9 - 4
Format: Numeric

Questions and instructions

Question pretext
SHOW CARD
Literal question
Is electricity No Obstacle, a Minor Obstacle, a Moderate Obstacle, a Major Obstacle, or a Very Severe Obstacle to the current operations of this establishment?
Categories
Value Category Cases
-9 Don't know 0
0%
-7 Does not apply 0
0%
0 No Obstacle 81
16.8%
1 Minor Obstacle 50
10.4%
2 Moderate Obstacle 75
15.6%
3 Major Obstacle 123
25.5%
4 Very Severe Obstacle 153
31.7%
Warning: these figures indicate the number of cases found in the data file. They cannot be interpreted as summary statistics of the population of interest.
Interviewer instructions
1)The manager should be given a card with the different alternatives for 'degree of obstacle' (from 0 to 4).
2) Sensitive question, no clarification can be offered.

Others

Notes
To what degree is Electricity an obstacle to the current operations of this establishment?
Back to Catalog
IHSN Survey Catalog

© IHSN Survey Catalog, All Rights Reserved.